Home |
Ski Resort Kopaonik |
Accomodation |
Ski Cameras |
Ski Info |
Ski Pass |
Ski Forecast |
Ski Tracks and Lifts |
Artificial Slope |
Videos |
Adventure Holidays |
Bus Transportation |
Parking on Kopaonik |
Open Lifts |
0/24 |
(0%) |
Open Pistes |
41/49 |
(83.7%) |
Open Shortcuts |
27/30 |
(90%) |
Significant results achieved in reconstruction of road infrastructure |
Serbian Minister of Infrastructure Velimir Ilic at a press conference held at the Serbian government that this Ministry continued the work started by the previous government which has so far made 1,000 facilities and several thousand apartments from various programmes and paved around 3,000 kilometres of road with asphalt. Ilic said that great attention has been paid to reconstruction of roads in mountainous regions and gave the example of the Zlatibor-Kokin Brod road, leading to Kopaonik, and construction of infrastructure on Stara Planina mountain. He said that many local roads have been reconstructed in the Raska district, as well as in eastern Serbia where infrastructure has been neglected for years. He recalled that the European Investment Bank and the European Bank for Reconstruction and Development approved two credit lines worth €140 million, intended for reconstruction of rail infrastructure and motor pool.
|
Sunčana dolina Malo jezero Krst Pančićev vrh Treska Duboka 1 Karaman greben Mali karaman Mali karaman A Marine vode A Marine vode | Karaman Jaram Gobelja relej Gobelja Kneževske bare Gondola Brzeće Gvozdac Duboka 2 Krčmar BMW Mašinac Vučak 2 | Snow park Ski track Jaram Ski vrtić Children's Park Avantura park Night M.jezero Night KGB Night Pančić Read More >>> |
30.12.2024. 23:40 | Temp. Sunčana dol. |
Temp. JAT |
Wind | Humidity | Snow depth |
-2,3°C | -3.1°C | 73% | 50cm | ||
Weather conditions | Feels like -6°C |
Temp. Pančić -4°C |
2,1 m/s (E) |
Pressure 838 hPa | Pistes 20-50 cm |